logo
Delhi-Noida Traffic To Be Hit As Sarita Vihar Flyover Partially Closed

Delhi-Noida Traffic To Be Hit As Sarita Vihar Flyover Partially Closed

News183 days ago
Last Updated:
PWD to resume repair work on the Sarita Vihar flyover from Friday, leading to partial closure till August 8, likely causing heavy traffic from south-east Delhi, Noida, Faridabad
The Public Works Department (PWD) will resume repair work on the Sarita Vihar flyover from Friday, resulting in its partial closure until August 8. The flyover's closure is expected to impact traffic from south-east Delhi, Noida, and Faridabad. Consequently, Delhi Traffic Police has issued an advisory detailing traffic restrictions and alternative routes for commuters.
PWD officials announced that the carriageway from Badarpur to Ashram will be closed for repairs. The department had initially started long-pending repair work in October 2024, but it was suspended midway due to rising pollution levels and the implementation of the Graded Response Action Plan (GRAP) to control dust pollution in Delhi-NCR. To manage traffic during the closure, at least 50 additional police personnel have been deployed on the flyover.
A senior PWD official stated, 'The repair work was delayed due to elections, the model code of conduct, and weather conditions. Fresh permissions were also required for traffic restrictions."
The Sarita Vihar flyover, located on Mathura Road, connects Delhi to Noida (Uttar Pradesh), Faridabad (Haryana), and parts of south-east Delhi. This is the first time in 24 years that the flyover will undergo major repairs.
The PWD initially planned to start repair work in 2023. However, it faced repeated delays due to various reasons, including the untimely publication of traffic diversion notices in newspapers, which led to the withdrawal of traffic police approval. Other factors like the Lok Sabha elections, Kanwar Yatra, and rising pollution levels also contributed to the postponements.
Traffic Advisory & Alternative Routes
According to traffic police, commuters travelling from Badarpur in south-east Delhi towards South Delhi and Faridabad will likely face congestion near Mathura Road. Areas like Sarita Vihar, New Friends Colony, Okhla, and Govindpuri may experience long traffic jams.
The route from Badarpur to Ashram via the flyover will remain closed. Police have urged people to avoid the affected stretch and use the following alternative routes:
Alternative Route 1:
Commuters from Badarpur can take MB Road towards Pul Prahladpur and Lal Kuan, turn right towards Maa Anandmayi Marg, Crown Plaza, Govindpuri, and then use Modi Mill flyover to reach Mathura Road and the Ashram.
Alternative Route 2:
Travellers can also use the slip road adjacent to the Sarita Vihar flyover, turn left towards Okhla, go through Crown Plaza and Govindpuri, and then take a right turn at Modi Mill flyover to reach Mathura Road.
Expect Heavy Congestion
Traffic police officials added that the movement of heavy and commercial vehicles will be restricted on Mathura Road between Badarpur and the Sarita Vihar flyover.
For the past week, traffic has already been disrupted in Kalindi Kunj, Mathura Road, and Sarita Vihar due to restrictions in place for the Kanwar Yatra. With the repair work now resuming, traffic congestion in these areas is expected to worsen over the next two weeks.
First Published:
July 25, 2025, 10:53 IST
Disclaimer: Comments reflect users' views, not News18's. Please keep discussions respectful and constructive. Abusive, defamatory, or illegal comments will be removed. News18 may disable any comment at its discretion. By posting, you agree to our Terms of Use and Privacy Policy.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Tripura Government Directs NHIDCL To Finish National Highway Repairs Before Durga Puja
Tripura Government Directs NHIDCL To Finish National Highway Repairs Before Durga Puja

Hans India

time15 hours ago

  • Hans India

Tripura Government Directs NHIDCL To Finish National Highway Repairs Before Durga Puja

The Tripura government has mandated the National Highways and Infrastructure Development Corporation Ltd (NHIDCL) to finalize repairs on the Assam-Agartala National Highway ahead of Durga Puja, the most prominent festival in the state, which begins on September 29. This directive comes after several sections of the highway, notably between Kumarghat and Churaibari in the Unakoti and North districts, suffered significant damage during the monsoon season. Senior officials, including Public Works Department (PWD) Secretary Kiran Gitte and representatives from state PWD and NHIDCL, recently inspected the affected areas to assess the situation firsthand. Gitte emphasized the urgent need to restore the highway, confirming that NHIDCL has been instructed to finish all pending repair work before the festival to prevent public inconvenience. Additionally, Chief Minister Manik Saha had earlier reviewed the condition of roads across the state and called for urgent repairs, particularly on national highways under NHIDCL's purview. The state authorities highlighted that roads managed by the state PWD are generally in better condition compared to those executed by NHIDCL through subcontractors. Efforts are underway to secure the involvement of high-level officials from NHIDCL and the central government in overseeing quality and ensuring long-term solutions, including the construction of resilient RCC roads to withstand heavy rainfall in the future.

Japanese businessman leaves empire behind to become Shiva devotee in Uttarakhand: ‘That dream changed everything'
Japanese businessman leaves empire behind to become Shiva devotee in Uttarakhand: ‘That dream changed everything'

Mint

time20 hours ago

  • Mint

Japanese businessman leaves empire behind to become Shiva devotee in Uttarakhand: ‘That dream changed everything'

A 41-year-old Japanese man has traded his business empire for a life of spiritual pursuit in India. Hoshi Takayuki, now known as Bala Kumbha Gurumuni, was once the owner of a successful chain of beauty product stores in Tokyo. Today, he is a saffron-clad Shiva devotee, walking barefoot on a pilgrimage through Uttarakhand. Accompanied by 20 Japanese followers, Mr Takayuki was recently spotted participating in the Kanwar Yatra, carrying holy Ganga water. He also organised a two-day food camp for fellow kanwariyas in Dehradun, offering meals as part of his spiritual service. According to a report in The Times of India, Mr Takayuki's spiritual journey began nearly 20 years ago during a visit to Tamil Nadu, where he encountered Nadi astrology, an ancient Siddha practice involving palm-leaf manuscripts. The reading reportedly revealed that he had lived a past life in the Himalayas and was destined to follow a path rooted in Hindu spirituality. The turning point, however, came in a vivid dream. 'I saw myself in Uttarakhand in a past life. That dream changed everything,' he told TOI. Following this experience, Mr Takayuki gave up his business and adopted a new spiritual identity. He converted his Tokyo home into a Shiva temple and built another shrine soon after. In July, he returned to India to join the Kanwar Yatra. His friend Ramesh Sundriyal, an Indian-origin resident of Japan, shared that Mr Takayuki has also purchased 35 acres of land in Puducherry, where he plans to build a major Shiva temple. An ashram in Uttarakhand is also on the cards. 'I feel deeply attached to Devbhoomi Uttarakhand. I believe I spent my past life here and am still searching for my village in the hills,' Mr Takayuki said.

Full Kalyani E-way run likely before puja
Full Kalyani E-way run likely before puja

Time of India

timea day ago

  • Time of India

Full Kalyani E-way run likely before puja

Kolkata: The much-awaited elevated corridor, connecting Belgharia Expressway with Kalyani Expressway, is slated for opening before Durga Puja. The 1.3-km flyover will ensure seamless connectivity between Kolkata and north Bengal via the upgraded 44.2km Kalyani Expressway. Tired of too many ads? go ad free now "This Durga Puja, people of Bengal will receive a big gift in the form of a full-length, signal-free Kalyani Expressway," Bidhan Biswas, chairman of North Dum Dum Municipality, told TOI. According to officials of the public works department (PWD), the expressway— one of the state's largest projects in recent times being executed at Rs 2,500 crore — is nearing completion, with the work being scheduled to wrap up by Aug-end. Once operational, the travel time between Kolkata and Kalyani AIIMS (approximately 43 km) is expected to drop to just 45 minutes from two-and-a-half hours at present. "The expressway also serves as a crucial bypass, steering clear of congestion-prone areas, like Barasat. It offers quicker access to the airport from districts, such as Nadia, Howrah, Hooghly and Burdwan," the official said. The Kalyani Expressway, featuring four to six lanes and toll booths, will now integrate with the 16-km Belgharia Expressway, a high-speed corridor connecting Dakshineswar with the airport. The expressway's revamped infrastructure includes elevated corridors and six-lane underpasses at major intersections, eliminating traffic signals along the entire stretch from Belgharia to Baro Jagulia via Kampa More near Kanchrapara. A senior engineer from PWD said a 3.8-km stretch between the Belgharia and Kalyani Expressway was already complete. Kalyani and Belgharia expressways meet at a point between Mathkal and Sukantapally in North Dum Dum, known locally as the "Zero Point". Tired of too many ads? go ad free now To avoid congestion at this junction, the state govt is constructing a 1.3-km elevated corridor above the Zero Point crossing, allowing uninterrupted flow of both Dakshineswar- and airport-bound traffic. The flyover is expected to descend near the Nimta crossing in North Dum Dum.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store