logo
Tunisia: Development plan 2026–2030 completed at local level (S-G of Economy Ministry)

Tunisia: Development plan 2026–2030 completed at local level (S-G of Economy Ministry)

Zawya3 days ago

Tunis – The 2026/2030 development plan, drawn up within a new institutional framework, had been completed at the local level, while the regional component is expected to be finalised within a month, Secretary General of the Economy and Planning Ministry Faouzi Ghrab revealed.
In an interview at TAP studio, Ghrab pointed out that the plan had been drawn up on the basis of a relationship between the local and central levels, explaining that this approach had not been adopted in previous plans, which had focused on a central system presenting development proposals and guidelines.
The 2026/2030 plan is part of a political and institutional framework based on the concept of 'construction and edification' and based on the realisation of the Constitution's goals, notably the social role of the State and self-reliance, while giving importance to local and regional aspects in the proposal of development policies, he said.
The National Council of Regions and Districts, which is the second chamber of parliament, has prerogatives in terms of drawing up and adopting development plans, the official underlined.
The role of the ministries and public authorities in drawing up the plan is to provide support, training and the necessary tools, he specified.
As regards the progress made in drawing up the plan, the Secretary General indicated that his department is endeavouring to meet the deadlines set out in the circular issued by the Prime Ministry.
He pointed out that the 2026/2030 plan is based on a bottom-up process, giving local and regional councils an important role in proposing and implementing the plan.
In its contribution to the development of the plan, each council goes through three stages: the diagnosis of the development situation, the identification of problems and the establishment of lists of priorities or projects, he explained.
Reports are then submitted to the regional councils, which must in turn submit a summary report by July 22, he further explained.
The emphasis is laid on proposing feasible projects based on data and technical studies, he pointed out, adding that the ministry provides project data sheets to facilitate the proposal process by the local councils.
© Tap 2022 Provided by SyndiGate Media Inc. (Syndigate.info).

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

In Ituri, authorities and armed groups seek to reinforce the 2023 peace accord
In Ituri, authorities and armed groups seek to reinforce the 2023 peace accord

Zawya

time3 days ago

  • Zawya

In Ituri, authorities and armed groups seek to reinforce the 2023 peace accord

In Aru, a new round of peace talks is building on earlier efforts to bring stability to Ituri province. The dialogue, known as 'Aru 2', brings together authorities, armed groups, local leaders, and civil society to reinforce the process launched in 2023. That previous initiative, supported by MONUSCO, led to the signing of a peace protocol by several armed groups including CODECO, ZAIRE, FRPI, FPIC, TCHINI YA TUNA, and MAPI pledged to cease hostilities and work towards peace, security and cohesion in the province. Their commitment to end hostilities resulted in tangible gains: displaced families returned home, local markets reopened, and roads such as the Nizi-Mongbwalu route became passable again. This new round of discussions aims to safeguard and expand those gains . At Aru, the participants now intend to build on these achievements. For five days, they will review the commitments made in 2023. " Aru 1 was half a success. Not all commitments were met, but progress was made," says Firmin Kone Massagnou of MONUSCO's Civil Affairs section. Renewed Expectations Over the course of five days, participants are reviewing past commitments and negotiating a new ceasefire. " We must also restart socio-economic activities to support the lasting return of displaced communities." said Massagnou. Civil society representative Jean-Marie Ezadri urged local leaders to encourage fighters to disarm and join the national reintegration programme (PDDRC-S). Sarah Muderwa, from Synergie des jeunes filles de l'Ituri, said she hoped this renewed engagement would help stop sexual violence. Another priority is the return of traditional and administrative authorities to their communities, seen as essential for restoring local governance. At the launch of the talks, General Antoine David Mushimba, commander of the 32nd military region, appealed to armed youth to embrace peace. MONUSCO reiterated its commitment to supporting this process alongside national institutions, in line with its mandate to protect civilians. Distributed by APO Group on behalf of Mission de l'Organisation des Nations unies en République démocratique du Congo (MONUSCO).

Tunisia: Development plan 2026–2030 completed at local level (S-G of Economy Ministry)
Tunisia: Development plan 2026–2030 completed at local level (S-G of Economy Ministry)

Zawya

time3 days ago

  • Zawya

Tunisia: Development plan 2026–2030 completed at local level (S-G of Economy Ministry)

Tunis – The 2026/2030 development plan, drawn up within a new institutional framework, had been completed at the local level, while the regional component is expected to be finalised within a month, Secretary General of the Economy and Planning Ministry Faouzi Ghrab revealed. In an interview at TAP studio, Ghrab pointed out that the plan had been drawn up on the basis of a relationship between the local and central levels, explaining that this approach had not been adopted in previous plans, which had focused on a central system presenting development proposals and guidelines. The 2026/2030 plan is part of a political and institutional framework based on the concept of 'construction and edification' and based on the realisation of the Constitution's goals, notably the social role of the State and self-reliance, while giving importance to local and regional aspects in the proposal of development policies, he said. The National Council of Regions and Districts, which is the second chamber of parliament, has prerogatives in terms of drawing up and adopting development plans, the official underlined. The role of the ministries and public authorities in drawing up the plan is to provide support, training and the necessary tools, he specified. As regards the progress made in drawing up the plan, the Secretary General indicated that his department is endeavouring to meet the deadlines set out in the circular issued by the Prime Ministry. He pointed out that the 2026/2030 plan is based on a bottom-up process, giving local and regional councils an important role in proposing and implementing the plan. In its contribution to the development of the plan, each council goes through three stages: the diagnosis of the development situation, the identification of problems and the establishment of lists of priorities or projects, he explained. Reports are then submitted to the regional councils, which must in turn submit a summary report by July 22, he further explained. The emphasis is laid on proposing feasible projects based on data and technical studies, he pointed out, adding that the ministry provides project data sheets to facilitate the proposal process by the local councils. © Tap 2022 Provided by SyndiGate Media Inc. (

Tunisia: Persistent pollution in Gulf of Monastir, FTDES reiterates call for environmental state of emergency
Tunisia: Persistent pollution in Gulf of Monastir, FTDES reiterates call for environmental state of emergency

Zawya

time4 days ago

  • Zawya

Tunisia: Persistent pollution in Gulf of Monastir, FTDES reiterates call for environmental state of emergency

Tunis – The Tunisian Forum for Economic and Social Rights (FTDES) on Thursday reiterated its call to declare a state of environmental emergency and to take urgent, medium- and long-term measures to save ecosystems and production chains in the Gulf of Monastir. Noting the persistence of domestic and industrial pollution from the wastewater treatment plants of the National Office of Sanitation (ONAS) and factories at the Sayada-Lamta-Bouhjar station, the foul odours emanating from them, the death of numerous marine species (fish, crabs, etc.) and the yellowing of the sea in this area, the FTDES called for this 'hemorrhage,' which has been going on for more than 20 years, to be stopped. The forum also recalled the ordeal of the inhabitants of the towns of the Gulf of Monastir, particularly those of Ksibet el-Médiouni, Lamta and Sayada, denouncing the authorities' laissez-faire attitude towards the pollution generated by the Sayada-Lamta-Bouhjar treatment plant, which has been out of service for many years, causing serious environmental, economic and social consequences. The FTDES further pointed out that agreements reached with civil society, notably those regarding the shutdown of the plant and its conversion into a pumping station, have not been implemented, sparking protests and widespread discontent among Gulf communities. Emphasising the right of residents to a healthy environment, the Forum urged the environmental authorities to assume their legal and moral responsibilities and to stop the pollution, demanding that all those responsible for these environmental violations be held accountable. The FTDES considered that the lack of political will to resolve the pollution problem in the Gulf of Monastir will reinforce social unrest, exacerbate feelings of injustice and exclusion, and undermine citizens' confidence in state institutions and their ability to protect fundamental rights. © Tap 2022 Provided by SyndiGate Media Inc. (

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store