logo
#

Latest news with #WaterandPublicTransport

Perak Govt Hopes JRTB Upgrade Will Be Included In 13MP
Perak Govt Hopes JRTB Upgrade Will Be Included In 13MP

Barnama

time21-06-2025

  • Health
  • Barnama

Perak Govt Hopes JRTB Upgrade Will Be Included In 13MP

IPOH, June 21 (Bernama) -- Perak Menteri Besar Datuk Seri Saarani Mohamad has expressed hope that the proposal to upgrade the East-West Highway (JRTB) linking Gerik and Jeli will be included in the 13th Malaysia Plan (13MP). Saarani said the state government had conveyed its intention to Prime Minister Datuk Seri Anwar Ibrahim during his visit to Lumut last week. 'What's most important is to reassess the alignment and widening of the JRTB. The upgrade involves more than just resurfacing; it requires a full reconstruction, as the existing structure is so old that some of the damage has exposed the road base. 'This highway has been in use for over 40 years, and simply patching up damaged sections may no longer be sufficient. However, the state government fully understands that constructing a new alignment or rebuilding the JRTB would require substantial funding,' he said at a press conference after officiating the closing ceremony of the 2025 National Training Week at the Ipoh Convention Centre here today. Saarani said the state government has also instructed the State Infrastructure, Energy, Water and Public Transport chairman, Datuk Seri Mohammad Nizar Jamaluddin, and Human Resources, Health, Indian Community Affairs and National Integration chairman A. Sivanesan, to prepare a report and study on upgrading the JRTB and Gerik Hospital. 'Mohammad Nizar will obtain information and data from the Works Ministry regarding the upgrade of the JRTB, while Sivanesan is working on applying to the Health Ministry for the upgrading of Gerik Hospital, as there is an urgent need in the event of accidents. Typically, victims are taken to Hospital Taiping or the Raja Permaisuri Bainun Hospital. 'If upgraded, it would be sufficient for patients or victims to be treated at Gerik Hospital, provided it is equipped with the necessary facilities and expertise. Once the study is completed, we will submit a letter to the relevant ministry,' he added. In the early hours of June 9, a tragic accident along the JRTB near Tasik Banding, Gerik, claimed the lives of 15 Universiti Perguruan Sultan Idris (UPSI) students when the chartered bus transporting them from Jertih, Terengganu, to the main campus in Tanjong Malim, Perak, was involved in a crash. The crash also left 33 others injured, including the bus driver and his assistant, as well as the driver and three passengers of a multi-purpose vehicle.

Perak seeks JRTB upgrade in 13MP after fatal bus crash
Perak seeks JRTB upgrade in 13MP after fatal bus crash

The Sun

time21-06-2025

  • Health
  • The Sun

Perak seeks JRTB upgrade in 13MP after fatal bus crash

IPOH: Perak Menteri Besar Datuk Seri Saarani Mohamad has expressed hope that the proposal to upgrade the East-West Highway (JRTB) linking Gerik and Jeli will be included in the 13th Malaysia Plan (13MP). Saarani said the state government had conveyed its intention to Prime Minister Datuk Seri Anwar Ibrahim during his visit to Lumut last week. 'What's most important is to reassess the alignment and widening of the JRTB. The upgrade involves more than just resurfacing; it requires a full reconstruction, as the existing structure is so old that some of the damage has exposed the road base. 'This highway has been in use for over 40 years, and simply patching up damaged sections may no longer be sufficient. However, the state government fully understands that constructing a new alignment or rebuilding the JRTB would require substantial funding,' he said at a press conference after officiating the closing ceremony of the 2025 National Training Week at the Ipoh Convention Centre here today. Saarani said the state government has also instructed the State Infrastructure, Energy, Water and Public Transport chairman, Datuk Seri Mohammad Nizar Jamaluddin, and Human Resources, Health, Indian Community Affairs and National Integration chairman A. Sivanesan, to prepare a report and study on upgrading the JRTB and Gerik Hospital. 'Mohammad Nizar will obtain information and data from the Works Ministry regarding the upgrade of the JRTB, while Sivanesan is working on applying to the Health Ministry for the upgrading of Gerik Hospital, as there is an urgent need in the event of accidents. Typically, victims are taken to Hospital Taiping or the Raja Permaisuri Bainun Hospital. 'If upgraded, it would be sufficient for patients or victims to be treated at Gerik Hospital, provided it is equipped with the necessary facilities and expertise. Once the study is completed, we will submit a letter to the relevant ministry,' he added. In the early hours of June 9, a tragic accident along the JRTB near Tasik Banding, Gerik, claimed the lives of 15 Universiti Perguruan Sultan Idris (UPSI) students when the chartered bus transporting them from Jertih, Terengganu, to the main campus in Tanjong Malim, Perak, was involved in a crash. The crash also left 33 others injured, including the bus driver and his assistant, as well as the driver and three passengers of a multi-purpose vehicle.

Perak govt hopes JRTB upgrade will be included in 13MP
Perak govt hopes JRTB upgrade will be included in 13MP

The Sun

time21-06-2025

  • Health
  • The Sun

Perak govt hopes JRTB upgrade will be included in 13MP

IPOH: Perak Menteri Besar Datuk Seri Saarani Mohamad has expressed hope that the proposal to upgrade the East-West Highway (JRTB) linking Gerik and Jeli will be included in the 13th Malaysia Plan (13MP). Saarani said the state government had conveyed its intention to Prime Minister Datuk Seri Anwar Ibrahim during his visit to Lumut last week. 'What's most important is to reassess the alignment and widening of the JRTB. The upgrade involves more than just resurfacing; it requires a full reconstruction, as the existing structure is so old that some of the damage has exposed the road base. 'This highway has been in use for over 40 years, and simply patching up damaged sections may no longer be sufficient. However, the state government fully understands that constructing a new alignment or rebuilding the JRTB would require substantial funding,' he said at a press conference after officiating the closing ceremony of the 2025 National Training Week at the Ipoh Convention Centre here today. Saarani said the state government has also instructed the State Infrastructure, Energy, Water and Public Transport chairman, Datuk Seri Mohammad Nizar Jamaluddin, and Human Resources, Health, Indian Community Affairs and National Integration chairman A. Sivanesan, to prepare a report and study on upgrading the JRTB and Gerik Hospital. 'Mohammad Nizar will obtain information and data from the Works Ministry regarding the upgrade of the JRTB, while Sivanesan is working on applying to the Health Ministry for the upgrading of Gerik Hospital, as there is an urgent need in the event of accidents. Typically, victims are taken to Hospital Taiping or the Raja Permaisuri Bainun Hospital. 'If upgraded, it would be sufficient for patients or victims to be treated at Gerik Hospital, provided it is equipped with the necessary facilities and expertise. Once the study is completed, we will submit a letter to the relevant ministry,' he added. In the early hours of June 9, a tragic accident along the JRTB near Tasik Banding, Gerik, claimed the lives of 15 Universiti Perguruan Sultan Idris (UPSI) students when the chartered bus transporting them from Jertih, Terengganu, to the main campus in Tanjong Malim, Perak, was involved in a crash. The crash also left 33 others injured, including the bus driver and his assistant, as well as the driver and three passengers of a multi-purpose vehicle.

Bailey bridge to temporarily replace collapsed Sg Liat Bridge by April 30
Bailey bridge to temporarily replace collapsed Sg Liat Bridge by April 30

The Sun

time22-04-2025

  • Politics
  • The Sun

Bailey bridge to temporarily replace collapsed Sg Liat Bridge by April 30

SUNGKAI: The Bailey bridge, which will temporarily replace the collapsed Sungai Liat Bridge, is expected to be operational by April 30, said Deputy Works Minister Datuk Seri Ahmad Maslan. He said the road leading to the bridge must first be repaired, while the construction of the 46-metre-long bridge will commence tomorrow and is expected to be completed by April 27. 'We hope it can be completed as scheduled, as residents in the vicinity use this route daily,' he said after visiting the collapse site at Felda Sungai Klah. Also present was Behrang assemblyman Salina Samsudin. On April 20, the Sungai Liat Bridge collapsed, cutting off access to Felda Residence Hot Spring, Kampung Tisong and the Buyong Mas Sanctuary Campsite. The collapse left 136 individuals stranded, including 81 students from a local polytechnic living in the area. Yesterday, state executive councillor for Infrastructure, Energy, Water and Public Transport, Datuk Seri Mohammad Nizar Jamaluddin, announced that the collapsed bridge will be temporarily replaced with a Bailey bridge. Meanwhile, Deputy Works Minister Ahmad Maslan said the permanent bridge at the site is estimated to cost around RM3 million. Salina hoped the bridge could be completed as scheduled, as residents in the affected areas currently have to use an alternative route to reach Sungkai town. 'The 1.7-kilometre detour passes through an oil palm plantation and can only be used by those with four-wheel drive vehicles,' she said.

Bailey bridge to temporarily replace collapsed Sg Liat Bridge
Bailey bridge to temporarily replace collapsed Sg Liat Bridge

The Sun

time22-04-2025

  • Politics
  • The Sun

Bailey bridge to temporarily replace collapsed Sg Liat Bridge

SUNGKAI: The Bailey bridge, which will temporarily replace the collapsed Sungai Liat Bridge, is expected to be operational by April 30, said Deputy Works Minister Datuk Seri Ahmad Maslan. He said the road leading to the bridge must first be repaired, while the construction of the 46-metre-long bridge will commence tomorrow and is expected to be completed by April 27. 'We hope it can be completed as scheduled, as residents in the vicinity use this route daily,' he said after visiting the collapse site at Felda Sungai Klah. Also present was Behrang assemblyman Salina Samsudin. On April 20, the Sungai Liat Bridge collapsed, cutting off access to Felda Residence Hot Spring, Kampung Tisong and the Buyong Mas Sanctuary Campsite. The collapse left 136 individuals stranded, including 81 students from a local polytechnic living in the area. Yesterday, state executive councillor for Infrastructure, Energy, Water and Public Transport, Datuk Seri Mohammad Nizar Jamaluddin, announced that the collapsed bridge will be temporarily replaced with a Bailey bridge. Meanwhile, Deputy Works Minister Ahmad Maslan said the permanent bridge at the site is estimated to cost around RM3 million. Salina hoped the bridge could be completed as scheduled, as residents in the affected areas currently have to use an alternative route to reach Sungkai town. 'The 1.7-kilometre detour passes through an oil palm plantation and can only be used by those with four-wheel drive vehicles,' she said.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store