
BJP's Sunil Jakhar says AAP removed key clause of land acquisition law, SAD asks about money for policy
Tired of too many ads? go ad free now
"
Hitting out at AAP, Punjab BJP president Sunil Jakhar said, "I believe Punjab was used as an ATM from where they took out money. Now the central leaders of AAP from Delhi plan to use Punjab as a private bank."
On provisions in the policy as announced by the govt that farmers will get back a part of the land which they can use for developing group housing projects, Jakhar said, "This is a bait. The intent is clear, and they want to bleed Punjab of its money by treating it as a milch cow.
Punjab needs to be saved from this."
Jakhar said AAP govt "removed" a key clause of the Land Acquisition, Rehabilitation and Resettlement (LARR) Act, 2013, which otherwise could act as a "safety valve" to safeguard farmers' interests. The LARR Act, 2013, requires that the consent of 80% of landowners be obtained for private projects and that the consent of 70% of landowners be obtained for public-private partnership (PPP) projects.
The govt proposed to exempt five special categories that were created, namely defence, rural infrastructure, affordable housing, industrial corridors, and infrastructure projects, including PPP projects where the govt owns the land.
SAD leader Daljit Singh Cheema said govt will take possession of farmers' land, but there is no guarantee as to when it could be developed. "It took several years for Ludhiana to expand beyond Punjab Agricultural University (PAU).
Tired of too many ads? go ad free now
And the govt plans to acquire 25,000 acres. There will be no habitation in such a vast area for years. From where will this much population come to live in such a huge area? If acquired, farmers will lose their livelihood.
Not only farmers, but those in allied agriculture activities, those dealing in agri implements and fertilisers, for instance, would also get hit. It will also directly or indirectly impact landless labourers and the dalit community," he added.
Cheema asked the govt where was the money to develop the land it proposed to acquire. "If Rs 1 crore would be required to develop an acre of land, from where will Rs 25,000 crore come for developing 25,000 acres of land? AAP promises like giving Rs 1,000 per month to women remain unfulfilled. The Centre even cut the borrowing limit of the state to take loans. This scheme was, practically, rolled out for corruption. This is aimed at enabling the middlemen from Delhi to make money.
Otherwise, there is no justification for it," he said.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


India Today
8 minutes ago
- India Today
After Indus treaty pause, India floats tender to tap Chenab's full potential
Months after India put the Indus Waters Treaty (IWT) on hold, it is now moving to revive a long-stalled hydropower project on the Chenab — first envisioned six decades ago but held back by the very treaty with Pakistan. India has floated an international tender, which shows a definitive shift in its strategy on the Indus Water premier Centre-owned agency for hydropower development, the National Hydroelectric Power Corporation (NHPC), on July 29 invited international tenders for the 1,856-MW Sawalkote Hydroelectric Power Project on the Chenab River in Jammu and the suspension of the IWT in April after the terror attack in Pahalgam, India is now moving to harness a western river, previously allocated to Pakistan under the treaty, to maximise its hydropower potential. It is asserting its rightful share and prioritising water development of the Sawalkote Hydroelectric Power Project follows its approval by the Environment Ministry panel in July and its designation as a "project of national importance", which enabled the NHPC to float a Rs 200-crore tender on July 29, cutting red tape and fast-tracking clearances for adherence to the IWT restricted India to non-consumptive use of the western rivers, the Indus, Jhelum, and treaty limited India's ability to build storage-based or large-scale irrigation projects on these three rivers. As a result, hydropower projects on the western rivers were mandated to be run-of-the-river, meaning they couldn't store large volumes of the IWT mandated that India provide a six-month notice to Pakistan before commencing any project. However, with the treaty now kept in abeyance, this requirement is no longer in effect, and data sharing will also like Sawalkote, Kishanganga, and Baglihar, all located on western rivers or their tributaries, have often faced objections from Pakistan, even though they store only limited water and are primarily designed for electricity the decision to fast-track the Sawalkote project, coupled with India holding the IWT in abeyance, and reports of India restricting water flows from existing dams, is being seen as a significant change in India's water strategy with respect to Pakistan, which relies heavily on the Indus basin for agriculture and hydropower. Map showing the proposed location of the Sawalkote Hydroelectric Project on the Chenab River in Jammu and Kashmir, between Ramban and Udhampur districts (Source: NHPC DPR) SAWALKOTE TO OVERTAKE BAGLIHAR AS J&K'S BIGGEST HYDROPOWER PROJECTThe Sawalkote Hydroelectric Power Project, near Sidhu village in Ramban district, is poised to become Jammu and Kashmir's largest hydropower initiative, surpassing the 900 MW Baglihar in the 1960s by the Central Water Commission, the project remained dormant due to IWT restrictions and geopolitical National Hydroelectric Power Corporation (NHPC) recently issued an e-tender for its construction, with bids due by September 10, project would feature a 192.5-metre roller-compacted concrete gravity dam, designed as a run-of-the-river scheme to harness the Chenab's high-velocity flow in the Western Himalayas. With over 10,000 square kilometres of its catchment area above the snowline, the Chenab offers immense hydropower potential, estimated at over 150,000 MW across the project's revival aligns with India's push for energy self-reliance and strategic control over water from the western rivers' resources after the suspension of the IWT, which several experts had termed "one-sided". The Sawalkote Hydroelectric Power Project on the Chenab River, a run-of-the-river project, is estimated to cost Rs 22,704 crore in two phases. (Image: NHPC) INDIA REDEFINED RED LINES, PUTS NATIONAL INTEREST FIRSTSigned in 1960 under World Bank mediation, the IWT allocated the eastern rivers (Ravi, Beas, Sutlej) to India and the western rivers (Indus, Jhelum, Chenab) to Pakistan, with India permitting limited non-consumptive uses like hydropower on the western Chenab, flowing from Himachal Pradesh through Jammu and Kashmir into Pakistan's Punjab, is critical for Pakistan, with the Indus Valley collectively irrigating 80% of its suspension of the IWT in April, citing Pakistan's support for cross-border terrorism, freed India from treaty obligations like data-sharing and prior notification of projects. India has since restricted water flows from the Baglihar and Salal dams on the Chenab, with reservoir flushing operations in May reducing downstream flows by up to 90% at Pakistan's Marala headworks, according to Pakistan's Indus River System Chenab's reduced flow threatened Kharif crop sowing between April and June, particularly paddy and cotton, critical for Pakistan's food security and textile industry, respectively. Fluctuating water levels, observed in May, with flows dropping to 3,100 cusecs at Marala, rang alarms in Islamabad, with Pakistan's Prime Minister Shehbaz Sharif calling the IWT suspension an "act of war".Later, Pakistan urged India to restore the treaty, and proposed dialogue to renegotiate India is instead focussing on its own priorities, driven by strategic interests and long-term plans to expand storage at existing dams and build new ones. India is now focussed on water and energy security with all seriousness, and the international tender for the Chenab hydropower project reflects that.- EndsMust Watch advertisement

The Hindu
8 minutes ago
- The Hindu
It was Congress' conspiracy to malign Hindu community: Indore man discharged in Malegaon blast case
An Indore-based businessman who was discharged in the 2008 Malegaon blast case eight years ago, on Thursday (July 31, 2025) welcomed the acquittal of seven accused, and alleged that he was implicated in the case as a result of the Congress's "conspiracy" to malign the Hindu community. Demanding an apology from the Opposition party, he accused it of coining terms like "Hindu terrorism" and "saffron terrorism" to appease a particular section of society. A special court in Mumbai acquitted all seven accused, including former BJP MP Pragya Singh Thakur and Lt Colonel Prasad Purohit, observing that there was "no reliable and cogent evidence" against them. The blast had killed six persons and injured 101 others nearly 17 years ago on September 29, 2008. Businessman Shyam Sahu from Indore, who was arrested in this case in October 2008, said he was in judicial custody for three years. The special court, however, discharged him in 2017 citing lack of evidence. Talking to PTI, Mr. Sahu alleged that he, Pragya Singh Thakur and others were implicated as part of a "Congress conspiracy" to malign the Hindu community by coining terms such as "Hindu terrorism" and "saffron terrorism" to appease a particular section. "We have got justice," he said about the court verdict. "The Congress' conspiracy has been exposed. The party should apologise for its conspiracy, though I don't think it will," he said. He said he had to face several "ordeals" following his arrest in the case. "While I was in jail after my arrest, my elder brother Mohan Sahu came to support me during a court appearance. Before my eyes, he suffered a heart attack and died about half-an-hour later. I could not do anything to save him," he added. "No one can compensate for the loss my family suffered due to the death of my elder brother," Mr. Sahu said.


Mint
8 minutes ago
- Mint
Vice President Election race: Poll schedule to be announced soon, preparation of Electoral College completed, says EC
The Election Commission of India said on Thursday, 31 July, that it will soon announce the schedule for the election to the vice president's office. The poll panel said it has finalised the Electoral College list for the Vice Presidential Election, 2025. As per Article 66(1) of the Constitution, the Vice President of India is elected by an Electoral College comprising the elected members of the Rajya Sabha, the nominated members of the Rajya Sabha, and the elected members of the Lok Sabha. The announcement comes after Jagdeep Dhankhar resigned as Vice President on 21 July, opening the contest for his successor. Dhankhar, 74, assumed office in August 2022, and his tenure was till 2027. Dhankhar's abrupt resignation followed a day of surprising developments in the Rajya Sabha for the government, as an opposition-sponsored notice for a motion to remove Allahabad High Court judge Yashwant Varma was submitted to him and he mentioned it in the House. Accordingly, the poll panel said it has already started preparing for the Vice Presidential Elections in 2025 and that the election schedule will follow soon. 'The Electoral College list will be available for purchase at a counter set up in Election Commission of India from the date of notification, which is likely to be announced soon,' the poll panel said. According to Articles 63 to 71 of the Constitution and the Vice-President (Election) Rules, 1974, a formal election must be held within 60 days of Dhankhar's resignation and before 19 September 2025. The electorate or the electoral college comprises all members of both Houses of Parliament—elected and nominated—using a proportional representation system via a single transferable vote. The MPs will cast a single transferable vote with a secret ballot. The electoral college currently has 788 MPs,588 in Lok Sabha and 245 in Rajya Sabha. The Electoral College list will be available for purchase at a counter set up in Election Commission of India from the date of notification. The Election Commission will announce the date of polls. The ruling BJP-led National Democratic Alliance(NDA) has a majority in the electorate, which includes the members of the Lok Sabha and the Rajya Sabha. Therefore, the probable names will likely be considered in the coming days.